COST
- SCHEDULE CONTROLS CONSTRUCTION
CLAIMS SUPPORT JOHN
J. STAUFFER 215 Detroit St. San Francisco, CA 94131 415-385-0065 johnjstauffer@att.net OVERVIEW With a professional
carrier in commercial, federal, public and residential construction, John
Stauffer provides both the breadth of general experience and the depth of
highly specific knowledge as a practitioner of preventative Construction
Management / Cost - Schedule Controls and curative Construction Claims
Support. By combining his professional skills with his familiarity of
current construction industry computer hardware and software, he provides a
cost effective, systematized approach to the review, control and in-depth
analysis processes required throughout a projects life-cycle. CONSTRUCTION RELATED SKILLS
- Direct and perform all aspects of the Competitive Bid and Negotiated
Price process
from
Initial Selection interviews to Contract Signing; -
Provide Estimation and Value Engineering Services utilizing current industry
techniques -
Provide Cost - Schedule Controls Services: Generate, Implement, Update and
Analyze
CPM Schedules (Primavera's P6, P3, SureTrak and Microsoft Project);
Line-of-Balance /
Productivity Schedules (Vico Schedule Planner); Lean / Last Planner Pull
Schedules; and
Monitor Cost and Schedule performance and
trends;
- Perform complete Construction /
Project Management Services through the implementation of
control systems: Primavera Contract Manager / Unifier, Meridian Prolog
Manager; - Expedite resolutions to construction
site problems through close personal contact
with Inspectors, Subcontractors,
Architects, Engineers and Clients; - Assist
Client and Legal Counsel in the Construction Dispute Resolution Process with
services
ranging from Alternative Dispute Resolution (ADR) to Expert Testimony; - Computer Literate. Microsoft
Office / Project, Prolog (Meridian), Construct Ware (Autodesk), P3 / SureTrak
/ P6 / Contract Manager / Unifier (Primavera), and Vico Schedule Planner
(Trimble); - Develop
Operational Systems, Processes and Procedures for office and field personnel;
- Extensive experience with CA / DSA - Public Schools & CA / OSHPD
– Hospitals - Hire, Train and Supervise
construction crews and management teams for projects ranging from Tenant
Improvements and Historical Restorations to Public Construction and
Environmental Remediation;
- Coordinate Subcontractor involvement from Subcontract Development to
Project Close-out; - Highly Skilled Mechanic capable of
concrete, light & structural steel, and wood
frame
construction with extensive background in finish carpentry.
EDUCATIONAL BACKGROUND Marlboro College - Marlboro,
VT
B.A. Ancient Greek Studies. 1976 Trumbull High School - Trumbull,
CT
Diploma. 1969 CONTINUING TRAINING
- Primavera P6 / P3 / SureTrak Scheduling - Kelar Corp., SF, CA /
Primavera Systems, SF, CA
- Primavera Expedition / Contract Manager / Unifier - Primavera
Systems, SF, CA - Prolog
Manager – ICT, Charlotte, NC
PROFESSIONAL AFFILIATIONS
- Construction Management Association of America
- Project Management Institute
- SF/Bay Area Primavera User Group
- AACE International
- Lean Construction
Institute
- International Code Council PROFESSIONAL
CERTIFICATION
- PMP
Project Management Certification (PMI – expired)
- PSP
Scheduling Certification (AACEI - expired)
- OSHA
30-Hour Certification PROFESSIONAL EXPERIENCE COST & SCHEDULE CONSULTANT, San Francisco Bay
Area
JUN2015 – OCT2015
Latest Project was the development of P6 Cost & Resource loaded Baseline
/ Revised Baselines
and
multiple Recovery Schedules for a distressed water treatment plant in Northern
California.
Lean Schedule techniques were utilized throughout this process to coordinate
and optimize
the efforts of multiple prime, second and third tier
contractors. COST & SCHEDULE ANALYST, Parsons / AGSE CM,
Palo Alto,
CA
JAN2014 – JUN2015
Responsible for development and maintenance of Program Master Schedule for
the DVA
Palo
Alto Veterans Hospital multi-phased reconstruction program. Provide
conformance analysis /
reporting
of Baseline / Update / Weekly Performance Schedules & Reports, and Change
/ Impact
Claim submissions. CONSTRUCTION MANAGER / COST & SCHEDULE
ANALYST,
SEP10
– AUG13 West Contra Costa Unified School District,
CA
Responsible
for development and maintenance of Program Master Schedule. Provide
conformance analysis / reporting of Baseline / Update / Weekly Performance
Schedules
& Reports, and Change / Impact Claim
submissions. SCHEDULE MANAGER, Vanir / Cornerstone
CM, Oakland, CA
MAR09 - AUG10
Assist
with development and review of time / cost contract provisions, conformance
analysis / reporting of Baseline / Update Schedules / Weekly Performance
Schedules
& Reports, and Change / Impact Claim submissions for Alameda County
Medical
Center / Highland Hospital - a 9 year, multi-project, $682 million public
program.
DIRECTOR PLANNING & SCHEDULING,
Actus Lend Lease, Napa /
Nashville
SEP07 - NOV08
Responsible for development, implementation, and analysis of both contract
management and
quantity based, CPM and linear scheduling systems, processes, procedures, and reporting
utilized by one of the largest military privatization, design-build
contractors in the US.
Included among these responsibilities was training, coordination and
direction of staff on
12 programs valued at $1.7
billion.
SENIOR SCHEDULER, Turner
Construction, Northern
California
JUN06 - JUN07
Providing
scheduling, contract analysis, and claims support for both GC and CM projects
ranging in value from $20M to $250M. CONSTRUCTION MANAGER, John Muir / Mount
Diablo Health System, Brentwood OCT04 -
JAN06
Consultant providing full service CM for both Core/Shell and TI build-out of
the health
systems 3 story, 95,000sq.ft. medical office building / ambulatory surgical
suite. These
services included the management & coordination of separate contractors
for the two
phases of the project, as well as, consultants for inspection, testing, and
reporting on code
& quality performance. CONSTRUCTION MANAGER, Applied Materials,
Santa Clara
SEP01
- JAN02
Consultant
responsible for developing contract, cost and schedule processes &
procedures
to Applied’s RPM tool hook-up group for management of international
projects. Provide CM
contract, cost and schedule services for RPM’s Applied Materials Building #85
Applications
Fab Project. $10.4M SENIOR PROJECT CONTROLS ENGINEER, Hatch Mott
MacDonald, Pleasanton MAR01 - SEP01
Responsible for
contract, cost and schedule review and analysis of contractor cost proposals,
claims, and schedules for the Santa Clara Valley Transportation Authority
Diridon Tunnels
Cut & Cover Project. $23.8M. PROJECT CONTROLS MANAGER, Commercial
Programs, IT Corp., Concord
1998 - 2001
Responsible for the analysis, coordination and direction of all Commercial
Program
Cost/Schedule Engineering in Western U.S. Projects and Claims range
from $1.4 to $35.2M.
Staff of 12 - 15 located from San Diego, CA to Anchorage, AK supporting as
many as 24
remediation projects. PRESIDENT and OWNER, Stauffer
Construction, San Francisco,
CA
1979 - Present
Stauffer Construction provides construction, consulting and management
services.
OWNER, John Stauffer Builder, Brattleboro,
VT
1975 - 1979 CARPENTER / FOREMAN, Tony Elliot
Builder, Brattleboro, VT
1971 - 1975
SELECTED BUILDING PROJECTS
CONTRACTOR:
- The Comstock Club
San Francisco, CA
Structural reinforcement and historical renovation of a 14,000 sqft,
four- story Victorian to an
A-occupancy private club.
Negotiated Contract amount: $1.9 million.
- Next Computer
Palo Alto, CA
High-end tenant improvements to their 4,500 sqft commercial offices for
Steven Jobs start-up company.
Negotiated Contract amount: $290,000.
- Steven Jobs Residences
Los Gatos and Woodside, CA
Renovation of Los Gatos and Woodside estates.
- Richard & Roselyn Swig Residence
San Francisco, CA
Extensive structural repairs and interior renovation of two-story
contemporary
residence.
Competitive Bid Contract amount: $1.4 million.
Commercial:
Residential and Estate Renovations: Fox and Carskaden Corporate, San Mateo,
CA Hanson Estate, Atherton,
CA
DHL Corporate, San Bruno,
CA
Horning Residences, Rodeo / San Francisco,
CA
Next Computer, Palo Alto,
CA
Mille Fleur Estate, Atherton,
CA
Frank, Rimerman Company, Menlo Park,
CA Pulaski
Residence, San Francisco, CA Facs Office Furniture, San Francisco,
CA
Schmitz Residence, San Francisco, CA Thomson Lithography Offices, Palo Alto CA
Wyler Residence, San Francisco, CA
Restaurants:
Retail and Wholesale Showrooms:
Blue Light Cafe, San Francisco,
CA
ComputerCraft, San Francisco, CA Ciao, San Francisco,
CA
Enesco, San Francisco, CA Gelato Classico, San Francisco & Palo
Alto, CA Ports
International, Palo Alto, CA MacArthur Park, San Francisco,
CA
Westinghouse, San Francisco,
CA Prego, San Francisco,
CA
University Club, San Francisco,
CA
CONSULTANT: Commercial:
Public:
Applied Materials #85 Demo Fab, SantaClara,
CA Mill Valley School District, CA Exelon / Energy Delivery Division, Chicago,
IL
San Francisco Unified School District, CA John Muir/Mount Diablo Health, Brentwood,
CA West Contra
Costa Unified School District, CA Target Corp., Minneapolis,
MN
Palo Alto Veteran’s Hospital, CA EMPLOYEE: Actus
Lend Lease, Napa,
CA:
Turner Construction, San Jose, CA: Army RCI,
HI
Laguna Honda Hospital / San Francisco,
CA
Camp Lejeune, NC
Lucile Packard Children’s Hospital / Palo Alto,CA Davis-Monthan AFB,
AZ
Santa Clara Crime Lab / Santa Clara, CA Fort Drum,
NY
Skylawn Funeral Home / San Mateo, CA Fort Hood, TX
The Plant Shopping Center / San Jose,
CA
Peterson AFB, CO
Valley Specialty Center / Santa Clara, CA
Washington Hospital / Fremont, CA IT Corp., Concord,
CA:
Chem Sales / Denver,
CO
Hatch Mott MacDonald, Pleasanton, CA: Fresno Landfill / Fresno,
CA
VTA Diridon Tunnel Project / San Jose, CA Iron Mountain Remediation / Redding,
CA
Montecello Remediation &
Claim
/ Monticello, UT Vanir
/ Cornerstone, Oakland, CA Penn Mine Closure & Claim / Campo
Seco,
CA
Alameda County Medical Center - Unocal
/ Santa Maria,
CA
Highland Hospital / Oakland,
CA
SELECTED HEAVY CIVIL
PROJECTS
-Diridon
Tunnel
San
Jose, CA
Served in the capacity of Lead Project Controls Engineer on the 900 ft. cut-and-cover
tunnel under the Diridon Station track-system. Analyzed, discussed, and
negotiated
the Base Contract Schedule of Values Costs and CPM Schedule Work-Plan with
project
Contractor. Coordinated logistics of track closing / relocation/ opening
between VTA /
Southern Pacific / Contractor / Sub-Consultants. Provided parallel Cost and
Schedule
Updates and Reporting including Cost and Time-Impact Analyses for all Change
Order
Requests. Participated in all Change Order negotiations as part of VTA’s
4-Discipline
Negotiation Team - Montecello Remediation &
Claim
Monticello,
UT
Analyzed,
coordinated, directed, and provided senior support for the final Re-Baselined
Master Schedule for the construction of repository cell & cap and
placement of low
grade radioactive waste. Developed Change & Delay procedures to
document continual
Change- in-Condition impacts. Trained replacement Cost / Schedule team.
Provided
Cost & Schedule Analysis to support dispute resolution.
Contract Amount: 35.2M. - Fresno
Landfill
Fresno,
CA
Developed Cost / Schedule systems & procedures for a 3 phase program to
cut, fill,
& cap the Fresno Landfill and construction of public sports complex.
Implemented daily
cost / time tracking with weekly forecast reporting per schedule activity.
Provided
senior support in Master Schedule development to accurately reflect subcontractor
workflows and sequencing regarding extensive underground, civil and structure
improvements. Analyzed, coordinated, directed project controls support
during construction.
Contract Amount: 23.8M -
Penn Mine Closure &
Claim
Campo
Seco, CA
Analyzed,
coordinated, directed, and provided senior support for the final Re-Baselined
Master Schedule for the construction of repository cell & cap and
placement of mine tailings.
Developed Change & Delay procedures to document Change-in-Condition
impacts.
Provided Cost & Schedule Analysis to support change orders and dispute
resolution.
Analyzed, coordinated, directed project controls support during construction.
Contract Amount: 7.6M -
Chem
Sales
Denver,
CO
Analyzed,
coordinated, directed, and provided senior support for the development of
Master Schedule for the construction of soil vapor extraction system to
remove organic
pollutants. Developed Change & Delay procedures to document potential
Cardinal Change.
Provided Cost & Schedule Analysis to support change orders and dispute
resolution.
Analyzed, coordinated, directed project controls support during construction.
Contract Amount: 4.5M -
Unocal
Santa
Maria, CA
Developed
Cost / Schedule systems & procedures for removal of contaminated refinery
pipes in environmentally sensitive area. Implemented daily cost / time
tracking with
weekly forecast reporting per schedule activities. Developed Change &
Delay procedures
to document potential Cardinal Change. Analyzed, coordinated, directed
project controls
support during construction.
Contract Amount: 12.1M -
Iron Mountain
Remediation
Redding,
CA
Developed
Cost / Schedule systems & procedures draft for first 10 year remediation
and O&M of mining site funded by 1 trust and 3 separate insurers.
Contract Amount: +30M SELECTED HEALTHCARE & PUBLIC
PROJECTS
- Alameda County Medical Center – Highland
Hospital
Oakland,
CA
Provided in depth review and revisions to the Program’s contract documents
related to cost /
time
for the two Enabling projects and the design / build Campus project. Reviewed
/ Analyzed /
Reported on Contractor proposal, baseline, and update P3 or MS Project
schedule submittals to
determine contract compliance and work plan practicability from Infection
Control and Demolition
through Completion and OSHPD Closeout. Reviewed weekly look-ahead schedules,
project logs,
daily field reports, and all other applicable contemporaneous project
documents to assure accuracy
of Contractor monthly update schedules, and time-impact analysis for
requested change orders.
- John Muir / Mount Diablo Health System –
Brentwood
Campus
Brentwood,
CA
One of the two individuals
performing construction management services on this 3 story,
95,000sq.ft. medical office building / ambulatory surgical suite project.
Primary responsibilities
were contract, cost, schedule, and quality management for the Health System’s
TI Build-Out. Part
of the complexity of this project was that it involved 2 separate Owners (a
Developer and the Health
System), using 2 different sets of Contractors / Subcontractors (Core/Shell
and TI Build-Out), on a
building requiring both local and OSHPD (CA Office of Statewide Health
Planning & Development)
code compliance. As a result of Core/Shell code compliance and construction
defect issues, also
managed a team of inspection and testing consultants and provided claims
support. - Lucile Packard Children’s Hospital /
Stanford Medical Center
Palo Alto, CA
Reviewed project’s contract documents and baseline schedule submittal and assisted
the project
team
in Lean Scheduling, backward pass re-assessment of project scope from
Department
Relocation Logistics, Re-Design of Infection Control and Demolition through
Completion and
OSHPD Closeout for each phase of the renovation. Utilized results of these
efforts to create a
revised baseline schedule that conformed to all contract required phase
sequencing and
represented all floor-to-floor construction coordination issues. While
providing initial schedule
updates,
I trained on-site staff to provide both update and look-ahead schedules. - Mill Valley School District / Phase 1
Remodel
Program
Mill Valley, CA
Provided CM services for 4 Mill Valley schools during Phase 1 of the Remodel
Program. Primary
responsibilities were constructability review, contract, cost, and schedule
management for projects
that could not extend beyond summer shutdown. As such, considerable
coordination of design
team efforts and IOR inspections was required. - Palo Alto Veterans
Hospital
Palo Alto, CA
Providing in depth
review of the project’s contract documents and Contractor baseline and update
schedule submittals in either P3 or P6
formats to determine Contract, FAR, and VAR compliance
and work plan practicability from Infection Control and Demolition through
Completion. Review
weekly look-ahead schedules, project logs, daily field reports, and all other
contemporaneous
project documents and participate in site walks to assure the accuracy of
Contractor monthly
update schedules, and time-impact analysis for requested change orders. - Santa Clara Crime Lab
Santa Clara, CA
Provided in depth review of the project’s contract documents and Contractor
baseline and update
schedule submittals to determine contract compliance and work plan
practicability. Assisted CM in
negotiations with Contractor for a revised, contract compliant baseline.
Analyzed Contractor delay
claims and showed that by removing unnecessary activity sequencing the
project was actually
ahead of schedule. Reviewed weekly look-ahead schedules, monthly update schedules,
and time-
impact analysis for requested change orders. - Valley Specialty Center / Santa Clara
Hospital
Santa
Clara, CA
Provided in depth review of the project’s contract documents and Contractor
baseline and update
schedule submittals to determine contract compliance and work plan
practicability. Analyzed
Contractor delay claims and time-impact delay fragnets. Reviewed weekly
look-ahead schedules
and monthly update schedules. - Washington Hospital
Fremont, CA Reviewed the project’s contract documents
and baseline and update schedule submittals.
Assisted the project team in Lean
Scheduling, backward pass re-assessment of project scope from Infection Control and Demolition
through Completion and OSHPD Closeout required to complete the remaining phases of the
project. Utilized results to create a revised baseline, completion schedule. Provided initial
schedule updates and trained on-site staff to provide both
update and look-ahead schedules. PERSONAL INFORMATION Disaster / Medical Certifications: American Heart Association: ·
American
Heart Association - BLS for Healthcare Providers ·
American
Heart Association - Adult Cardiac Life Support ·
American
Heart Association - Pediatric Advanced Life Support American Red Cross: ·
American Red
Cross - Administering Emergency Oxygen ·
American Red
Cross - Bloodborne Pathogens ·
American Red
Cross - CPR / AED for Professional Rescuer ·
American Red
Cross - Emergency Response ·
American Red
Cross - First Aid for Public Safety Personnel ·
American Red
Cross - Wilderness & Remote First Aid Other: ·
NAEMT -
Prehospital Trauma Life Support ·
SFPA - 12
Lead ECG Interpretation ·
EMT National
Registry #B2007667 ·
SF / NERT
Basic & Advanced Outdoor Activities: ·
Randonneur
Cycling / Rowing – Single Shell / Running – Road & Trail ·
Nordic
Skating / Snowshoe Running / X-C Skiing Volunteer Certifications: Friendly Water for the World – ·
2013 BioSand
Water Filtration Certification Living Water International – ·
2013 Shallow
Water Well Drilling Certification Volunteerism: American Red Cross – ·
First Aid /
CPR Instructor ·
Emergency
Medical & Disaster Assistance Teams Bay Area Medical Services – ·
Volunteer EMT Fuller Center for Housing – ·
2011 Millard
Fuller Memorial Build – Minden, LA ·
2012
Lambi Duplex Housing Project – Leogane, Haiti ·
2012 Millard
Fuller Memorial Build – La Florida, Peru Habitat for Humanity – · San Francisco Affordable Housing Glide Memorial, SF – ·
Dining Hall
& Events Captain Martin de Pores Hospitality House - ·
Food Service
Volunteer Nepal Earthquake 2015 – ·
Medical
Clinics - Remote Area Medical / Sri Satya Sai Seva / Tzu Chi Foundation ·
Preparedness
& Sheltering – Bibeksheel Nepali / Deerwalk Foundation / Tzu Chi
Foundation / Nepal
Institute of Engineering / Immediate Earthquake Relief for Rural Nepal Partners In Health – ·
2012 Crew
Supervisor & Instructor: Mirebalais National Teaching Hospital, Haiti Remote Area Medical – ·
Team Captain ·
Los Angeles
2009 / New Orleans 2010 / Sacramento & Oakland, CA and Chicago 2011
Sacramento & Oakland, CA 2012 / Seattle 2014 / Nepal Earthquake 2015 San Francisco Medical Reserve Corps – ·
Volunteer EMT San Francisco National Maritime Museum – ·
Ship
Maintenance & Event Support San Francisco Neighborhood Emergency
Response Team
– · Neighborhood Coordinator – Sunnyside District Page 1 of 7 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
French |
Beginner |
|
|
Spanish |
Beginner |
|
|
|